References

Our recent case studies demonstrate the potential of our teams and skills. The first category deals with our strengths in the field of turnaround services for renowned clients. Furthermore we present our capability in the area of  tank repairs and upgrades.  You can also discover how Veltec teams excelled at the delivery and installation of new oil storage tanks. Please also take a look at how we delivered and installed new piping systems.

Our Turnaround Projects

We are proud to support our clients and deliver great results for turnarounds.

Our Tank Projects

Find out about our recent tank building achievements.

Our Piping Projects

Are you interested in our recent work in the area of pipe intallations?

VELTEC Case Piping: Alingsås Energi

Find out about our scope of work and look at specific projects which demonstrate our capabilities and competences in the disciplines:

  • Design
  • Engineering
  • Procurement
  • Erection and testing
Bild Case Study Piping Alingsas 2016 2 350x400 - Referencer

Scope of work

Veltec Industrial Services delivered and installed a Piping project in 2016 for Alingsås Energi, Sweden and carried out the following tasks:

  • Delivery of materials and installation
  • Piping and supports
  • Diameter DN15 – DN300
  • Valves
  • Pumps
  • Painting
  • Insulation
  • NDT
  • Pressure testing

Project Timeline

  • May 2016

    Award

  • 13 weeks later

    Completition

    13 weeks later

Facts

Type of contract: Turnkey
Delivery on schedule
Design, Engineering, Procurement, Erection and testing
No incidents
1.000 man-hours

Are you interested in more projects that show our skills across disciplines and industries? Please get in touch for a consultation with our experts.

Kontakt

Vil du vide mere? Spørg os. Send os en besked: denmarkveltec-services.com. Vi vil gerne høre fra dig: +45 57 666 000.

Veltec technischeProjeke 3x4 495x400 - Referencer